Now in Beta

The Operating
System for
Superintendents.

ForeSite is field-first intelligence for construction superintendents. Schedule management, document search, SWPPP reporting, and leadership coaching — built for the way you actually work.

80%
of field questions answered
by a single search
<30s
from slip to cascaded
reforecast
14d
lookahead built into
every morning briefing
0
generic SaaS features.
Built for the field.
The Platform

Everything a superintendent
actually needs.

Six integrated modules. One operating system. Built by a superintendent, for superintendents.

Module 02

Document Intelligence

One query searches your entire project — blueprints, scope letters, submittals, RFIs, emails. AI synthesizes the answer first, sources follow. 80% of field questions resolved without a phone call.

Blueprint OCR Scope Search AI Synthesis
Document Search
◆ ForeSite Answer
No. Drilling and epoxy installation is explicitly prohibited per S101 structural notes and confirmed by the architect in writing. All Simpson anchor rods must be wet-set. This is a structural requirement, not a preference — coordinate rod placement with Randy before the pour date is set.
2 Sources
Blueprints S101 · Structural Note · Pg 38 97%
Email CK Arch Confirmation · Pg 1 94%
📅
Module 03

Schedule Intelligence

Tell ForeSite "concrete got pushed 4 days" and it cascades the impact automatically — reforecasting every dependent task, flagging what falls in the next 14 days, and depositing urgent calls and draft emails into your action queue.

Cascade Engine Auto-Reforecast Action Queue
Schedule · Cascade Preview
9%
Done
2
Slipped
137
Days Left
4
In Window
Cascade Impact · 4 day slip
Underslab PlumbingJun 6Jun 10
Slab on GradeJun 17Jun 21
Exterior FramingJun 30Jul 4URGENT
Module 04

Leadership Coaching

A daily check-in that asks three sharp questions and gets out of the way. ForeSite tracks your Truth-to-Action score across five dimensions, surfaces behavioral patterns, and generates an honest end-of-phase performance report.

TTA Scoring Pattern Journal Phase Report
Leadership Check-In · TTA
72
TTA
5 sessions · Foundations
Accuracy is your strongest dimension. Escalation needs work.
Management Altitude
What did you handle today that should have stayed with a subcontractor?
Answer honestly. This is your record, not a performance.
◆ That's the pattern to watch. You saw the problem, had the data, and absorbed it anyway. The right move was a four-minute phone call.
01
Built for the Field

Mobile-first, offline-aware, and fast on a phone in the sun. ForeSite is designed for how superintendents actually work — not how software companies imagine they work.

02
Per-Project Intelligence

Every project gets its own document index, schedule, and contact map. The system learns your project — and over time, learns you. No shared data, no central server, no loss of institutional knowledge.

03
Truth-to-Action

ForeSite doesn't just surface information — it helps you convert information into timely, executable decisions. Every feature is designed to reduce ambiguity and improve execution.

Why ForeSite
"I usually know what I need to do to run a project with excellence. The problem is following through and executing when the schedule gets attacked."

ForeSite was built by a construction superintendent who got tired of losing altitude — getting pulled into subcontractor scope, losing sight of the schedule, and watching projects drift at the halfway point despite knowing exactly what needed to happen.

It's not a project management platform. It's not a scheduling tool. It's an operating system for how a superintendent actually thinks and works — from the morning briefing to the end-of-day accountability check.

Luke Orr · Superintendent · JRF Construction · Creator, ForeSite
80%
Field questions resolved instantly
Unified document search eliminates the chain of calls and Procore searches that eat 15 minutes per question.
14d
Lookahead built into every workflow
Weather, schedule, and coordination gaps surfaced two weeks out — before they become crises.
<30s
From slip to reforecast
Tell ForeSite what moved. It cascades the impact, flags urgent calls, and drafts the PM email.
TTA dimensions tracked per project
Altitude, execution, escalation, accuracy, waste suppression — scored daily, reported at phase close.
Early Access

Be first
on site.

ForeSite is in active development. Join the waitlist for beta access — we're onboarding superintendents who want to help shape the product.

No spam. No pitches. We'll reach out when your spot is ready.

You're on the list.
We'll be in touch when your beta access is ready. Thanks for being early.